2success1.gif (43125 bytes)
 
0
2largrr.gif (2460 bytes)
0
This job required the
remediation of contaminated
soil beneath track and rock
ballast. Note the TPH decrease
over a period of 49 days. Desert
conditions required the Integra
Team to use special procedures.
0
2airman.gif (2828 bytes)
0
The following results are from PCB and TPH contaminated soil in Dallas. TPH concentrations
have probably continued to fall since September. There is no detectable PCB left in the soil at all.
2air1.gif (47497 bytes) 2air2.gif (55125 bytes)
0
2newyork.gif (2688 bytes)
0
2newyork1.gif (73988 bytes) The floor of a New-York
electrical vault had become
highly contaminated with
various PCB’s. Local
sub-contracting forbade the
use of Integra products for
more than 38 days, but
impressive results were still
possible.
0
2hvycrude.gif (2681 bytes)
0
2hvycrude1.gif (66014 bytes) This project took place
near Tampico, Mexico.
Over several years, spillage
from a storage tank, along
with general pipe leaks, had
led to extremely heavy
contamination by thick crude
products in the soil.
Outstanding results were
achieved.
0
HOME