![]() |
|
|
|
SUCCESS STORIES
LARGE RAILROAD This
job required the remediation of contaminated soil beneath track and rock
ballast. Note the TPH decrease over a period of 49 days. Desert conditions
required the Integra
AIRCRAFT MANUFACTURER The following results are from PCB and TPH contaminated soil in Dallas. There is no detectable PCB left in the soil at all.
STATE OF NEW YORK The floor of a New York electrical vault had become highly contaminated with various PCBs. Even though the contaimination was not treated for the first 38 days impressive results were still possible using Integra products..
HEAVY CRUDE SPILL This project took place near Tampico, Mexico. Over several years, spillage from a storage tank, along with general pipe leaks, had led to extremely heavy contamination by thick crude products in the soil. Outstanding results were achieved.
|