|
||||
| 0 | ||||
![]() |
||||
| 0 | ||||
![]() |
This
job required the remediation of contaminated soil beneath track and rock ballast. Note the TPH decrease over a period of 49 days. Desert conditions required the Integra Team to use special procedures. |
|||
| 0 | ||||
![]() |
||||
| 0 | ||||
| The following results are from PCB and TPH contaminated
soil in Dallas. TPH concentrations have probably continued to fall since September. There is no detectable PCB left in the soil at all. |
||||
![]() |
||||
| 0 | ||||
![]() |
||||
| 0 | ||||
![]() |
The
floor of a New-York electrical vault had become highly contaminated with various PCBs. Local sub-contracting forbade the use of Integra products for more than 38 days, but impressive results were still possible. |
|||
| 0 | ||||
![]() |
||||
| 0 | ||||
![]() |
This
project took place near Tampico, Mexico. Over several years, spillage from a storage tank, along with general pipe leaks, had led to extremely heavy contamination by thick crude products in the soil. Outstanding results were achieved. |
|||
| 0 | ||||
| HOME | ||||